ENGE255
Syllabus
ENGE255
Advanced Surveying
Overview
Syllabus
Old questions
Syllabus
Orientation
(3 hours)
Analytical intersection and resection
Two points and three points resection and their significance
Instruction on field application
Triangulation and Trilateration
(7 hours)
Concepts and terminology
Accuracy of horizontal control systems
Triangulation figures; Choice of figures; Triangulation procedure
Angle and side conditions; Error propagation in triangulation; Strength of figure in triangulation; Base line
Triangulation computations
Trilateration
Combined triangulation and trilateration
Curves
(9 hours)
Types of curve
Simple circular curve
Transition curve
Vertical curve
Compound and reverse curve
Setting out of simple circular curve
Setting out of transition curve
Computation and staking of vertical curve
Mining Survey
(7 hours)
Concepts and terminology
Design of horizontal control networks in underground mines
Measuring depth of shaft
Measuring vertical depth
Mine orientation survey: Basic principle and classification
Measuring cross section
Gyroscopic methods of mine orientation
Roles and responsibilities of mine surveyor
Hydrographic Survey
(7 hours)
Hydrographic survey and its application
Sounding: Methods, equipment and location
Reduction of sounding
Plotting the sounding
Accuracy of positions
Depth determination
Ship borne echo-sounding and mechanical methods, airborne laser and electromagnetic methods, related corrections
Use of current meter and stream measurement
Construction Surveying
(4 hours)
Construction survey, importance and its application
Equipment for setting out
Horizontal and vertical control
Setting out of a bridge
Setting out of building and structures
Staking out a highway
Areas and Volumes
(8 hours)
Method of measuring area of irregular boundaries (Mid ordinate, average ordinate, Simpson's rule)
Area of closed traverse (Double meridian distance method, coordinates method)
Volumes by cross section method (Average end area, mean area, trapezoidal rule, prismoidal formula)
Volume from spot levels, contour plan
Mass haul curve, use of mass diagram
Practicals
Prepare a computer program in C for corrections to field observations
Intersection and resection using theodolite, computation and plotting
Triangulation and trilateration field works using theodolite and total station
Discharge measurement of a stream
Setting out of curve
Computation of volume of earthwork of given alignment of a road